This tutorial explains the modeling, analysis, and design of a 3-span continuous prestressed post-tensioned PSC Box Girder Bridge using Midas Civil. It covers section creation, construction stages, load applications, and PSC design following IRC standards.
Key Topics
Bridge Specifications
3-span continuous PSC box girder bridge with spans of 40m + 45m + 40m, constructed in three stages using a fully supported method. The bridge's behavior under static loads, prestress loads, temperature loads, and moving loads is analyzed.
Geometry Modeling
Detailed steps on generating the PSC box section, defining materials, time-dependent properties, and geometric features like diaphragms, piers, and supports.
Load Definitions
Covers applying static loads (self-weight, wearing course, crash barriers), prestress loads (tendon properties and profiles), temperature loads (rise, fall, gradients), and moving loads per IRC:6-2014.
Construction Stage Analysis
Explains defining construction stages, activating/deactivating elements, assigning boundary and load conditions, and managing creep, shrinkage, and prestressing effects.
PSC Girder Design
Guides through PSC girder design using IRC:112-2011, including reinforcement detailing, stress checks, tendon loss evaluation, and generating design outputs.
Result Interpretation
Details on reviewing analysis results like displacements, forces, stresses, and tendon losses, and how to generate comprehensive design reports.
The tutorial offers a complete workflow for modeling, analyzing, and designing a 3-span continuous PSC box girder bridge in Midas Civil, in compliance with IRC standards.
