This is the first part of a five-part midas Gen series on post-tension design to ACI 318M. It introduces the post-tensioning technique, its advantages and system types, the properties and terminology of prestressing steel, the four design stages with their loading conditions, member force definitions, member thickness guidance and the construction sequence for a post-tensioned slab. It provides the vocabulary and physical background needed for the design chapters that follow.
Key Topics
What Post-Tensioning Is
Tendons of prestressing steel inside plastic ducts or sleeves are placed in the formwork before concreting, then stressed and anchored against the concrete edges once the concrete has gained strength but before service loads act. Post-tensioning is therefore a form of prestressing, distinguished from pre-tensioning only by the sequence of concreting and stressing. Its benefits include eliminating or reducing shrinkage cracking and joints, holding any cracks tightly closed, permitting thinner members and longer spans, and allowing slabs on expansive or soft soils.
Bonded and Unbonded Systems
Unbonded post-tensioning uses light, flexible mono-strand that installs quickly, and is typical for elevated slabs, slabs-on-grade, beams, transfer girders, joists, shear walls and mat foundations. Bonded post-tensioning suits large structural elements such as beams and transfer girders, offering increased span length and load capacity with reduced deflection. The choice of system affects both design assumptions and the amount of additional bonded reinforcement required.
Prestressing Steel Properties and Terminology
The note defines the tendon area, the specified tensile and yield strengths, and the initial and effective prestress stresses, together with the corresponding maximum and effective prestress forces. Allowable tendon stress limits are stated for the instant of stressing and for the condition immediately after anchoring. These symbols recur throughout the remaining parts of the series.
Four Design Stages and Prestress Losses
The design proceeds through jacking, transfer, service and ultimate stages, each with its own prestress force. Between them the force is reduced by anchorage device seating, friction, elastic shortening of the concrete, creep, shrinkage and strand relaxation. Recognising which force belongs to which stage is the key discipline of post-tension design.
Loading Conditions Stage by Stage
At transfer the maximum prestress acts together with self-weight only, against the lower concrete strength available at stressing, and the checks are concrete tensile cracking, crushing and anchorage zone failure. At service the effective prestress acts with all unfactored design loads against the full design strength, and deflection and crack width govern. At ultimate the nominal tendon strength acts with factored loads, and flexural failure and compressive stress under flexure are checked.
Primary, Secondary and Net Moments
For a continuous member the primary moment comes from the prestress force acting at an eccentricity from the section centroid, and the deflection it would produce is restrained at intermediate supports. That restraint generates a reaction and hence a secondary moment, and the net moment acting on the real continuous beam is the sum of the two. A worked continuous beam illustrates the derivation of the reaction and the resulting moment.
Member Thickness and Depth Guidance
Span-to-depth ratios are tabulated for beams and for one-way and two-way slabs, separated by continuous or simple span and by roof or non-roof use, for both reinforced concrete and post-tensioned members. Comparison of the two tables shows a substantial reduction in required depth when post-tensioning is applied. Alternatively the same depth can be retained and the required reinforcement or tendon quantity reduced for an economical design.
Post-Tensioned Slab Construction Sequence
Nine steps are listed: installing slab formwork, placing slab reinforcement, setting bar chairs to the tendon profile height, laying tendons on the chairs, adding extra reinforcement, pouring concrete, inserting blocks and jaws, stressing while measuring elongation, and grouting. Elongation measurement during stressing is the field check that the intended force has been delivered. The sequence explains why the tendon profile must be fully resolved before concreting.
This introductory part establishes what post-tensioning is, how bonded and unbonded systems differ, and the staged framework of jacking, transfer, service and ultimate that organises all subsequent design work. It also gives practical proportioning guidance and the construction sequence, so the reader understands both the mechanics and the buildability of a post-tensioned member before entering the detailed design procedure.