This document presents a 3D numerical analysis of Shield TBM tunnel excavation using GTS NX. It focuses on simulating TBM-induced stresses, ground settlements, and tunnel support system behavior during excavation.
Key Topics
Modeling and Material Properties
Defines soil and rock layers with Mohr-Coulomb models and structural elements such as TBM plates, grouting materials, and tunnel segments.
TBM Tunnel Excavation Modeling
Simulates the TBM tunnel excavation process using staged removal of soil and sequential activation of tunnel lining and grouting materials.
Construction Stage Analysis
Implements a stepwise excavation sequence where segment thrust forces, face pressure, and external loads are applied per stage.
Stress and Deformation Analysis
Evaluates tunnel lining stresses, ground deformations, and load transfer mechanisms to assess stability during TBM advancement.
Seepage & Stability Analysis
Analyzes groundwater flow effects on tunnel stability, considering seepage forces and external water pressure on tunnel lining.
This study provides a structured workflow for analyzing Shield TBM tunnel behavior using GTS NX, integrating staged excavation, stress redistribution, and seepage effects to ensure structural stability.