[EN_GTSNX] 40-Shored Excavation

PDF
·
37ページ
·
3.7MB
·
English
·
2025.03.11 更新
概要

This document provides a tutorial on performing a 3D shored excavation analysis using MIDAS GTS NX. It explains step-by-step procedures for setting up the model, defining soil and structural properties, meshing, applying boundary conditions, defining excavation stages, and analyzing results.

主要内容

01

Step 1: Initial Model Setup

Guides users through creating a new project, defining model type, selecting unit systems, and configuring initial parameters.

02

Step 2: Defining Soil and Structural Materials

Covers soil material properties using the Mohr-Coulomb model, as well as elastic properties for concrete walls and steel supports.

03

Step 3: Geometric Modeling

Explains how to create the 3D excavation geometry, including soil layers, retaining walls, and excavation zones.

04

Step 4: Meshing and Element Assignment

Covers mesh generation for soil and structural elements, including defining interface elements between walls and surrounding soil.

05

Step 5: Boundary Conditions and Load Assignments

Describes the application of self-weight loads, boundary constraints, groundwater table effects, and surcharge loads.

06

Step 6: Defining Construction Stages

Explains the staged excavation process, activation of retaining structures, and application of pre-stressed anchor loads.

07

Step 7: Execution of Analysis

Details the process of setting up and running construction stage analysis to evaluate excavation-induced deformations and structural stability.

08

Step 8: Results Interpretation

Explains how to extract displacement contours, bending moments in walls, axial forces in supports, and safety factor evaluation.

まとめ

This tutorial demonstrates the workflow for conducting 3D shored excavation analysis using MIDAS GTS NX. It provides insights into staged excavation behavior, retaining wall performance, and ground deformation control.

関連資料

同じカテゴリー・トピックから厳選した資料です。

GEO · TUTORIAL[EN_GTSNX] 34-3D Geogrid Reinforced Slope Stability Tutorial
GEO · TUTORIAL[EN_GTSNX] 37-2D Earth Retaining Stabilizing System
GEO · TUTORIAL[EN_GTSNX] 42-Excavation_Anchored Sheet Pile Wall
GEO · TUTORIAL[EN_GTSNX] 43-Excavation with Walls, Struts, Wallers