[EN_GTSNX] 57-2D Tunnel Construction Stage

PDF
·
26ページ
·
2.1MB
·
English
·
2025.03.11 更新
概要

This document provides a tutorial on performing 2D tunnel construction stage analysis using MIDAS GTS NX. The tutorial focuses on modeling excavation sequences, support system implementation, and analyzing stress-strain responses during tunnel excavation.

主要内容

01

Overview of 2D Tunnel Construction Stage Analysis

Explains the importance of staged tunnel excavation modeling to assess ground stability, deformation control, and stress variations in the support structures.

02

Material Properties and Structural Components

Defines soil, rock, shotcrete, and rockbolt properties using the Mohr-Coulomb and elastic models. Includes different stiffness values for shotcrete at various stages.

03

Geometric Modeling and Mesh Generation

Describes the process of creating tunnel geometry, defining boundary conditions, and generating 2D meshes for accurate excavation analysis.

04

Boundary Conditions and Load Assignments

Covers self-weight loads, lateral earth pressure coefficients, and staged stiffness transitions of tunnel linings.

05

Construction Stage Analysis

Explains sequential excavation steps, activation of tunnel support elements (shotcrete and rockbolt), and load distribution factors (LDF) for staged analysis.

06

Post-Processing and Structural Performance Evaluation

Analyzes tunnel displacement, axial forces in rockbolts, bending moments in shotcrete linings, and stress distribution in excavation zones.

まとめ

This tutorial provides a structured workflow for 2D tunnel construction stage analysis using MIDAS GTS NX. It enables engineers to assess excavation-induced deformations and support system performance through advanced finite element modeling techniques.

関連資料

同じカテゴリー・トピックから厳選した資料です。

GEO · TUTORIAL[EN_GTSNX] 54-3D Tunnel Connection
GEO · TUTORIAL[EN_GTSNX] 60-Horse Shoe Shaped Tunnel
GEO · TUTORIAL[ES_GTSNX] 21_2D_Earth Retaining Stabilizing System
GEO · TUTORIAL[EN_GTSNX] 55-3D Cavern_Power House