This tutorial explains the step-by-step modeling, analysis, and design of a 3-span continuous prestressed post-tensioned PSC Box Girder Bridge using Midas Civil as per IRC standards.
主要内容
Bridge Specifications
The bridge has a span configuration of 40m + 45m + 40m, a width of 8.5m, and is constructed in three stages using a fully supported method. The behavior under static, prestress, temperature, and moving loads is analyzed.
Geometry Modeling
Detailed steps for generating the PSC box section, defining materials, time-dependent properties, diaphragms, piers, supports, and tapered sections.
Load Definitions
Instructions on applying static loads (self-weight, wearing course, crash barriers), prestress loads (tendon properties and profiles), temperature loads (rise, fall, gradients), and moving loads according to IRC:6-2014.
Construction Stage Analysis
Defines construction stages reflecting the evolving structural configurations, elastic and time-dependent effects like creep and shrinkage, and managing prestressing effects throughout the stages.
Prestress and Moving Load Analysis
Covers prestress tendon profiles, jacking forces, tendon losses, and the setup of moving load cases following IRC standards.
PSC Girder Design
PSC girder design according to IRC:112-2011, including stress checks, reinforcement detailing, and design output generation.
Result Interpretation
Instructions on reviewing analysis results such as member forces, stresses, displacements, tendon losses, and load combination effects.
This tutorial provides a comprehensive workflow for modeling, analyzing, and designing a 3-span continuous PSC Box Girder Bridge using Midas Civil, following IRC:6-2014 and IRC:112-2011 standards.
