[EN_GEN] Construction Stage Analysis Reflecting Long-Term Deformation

PDF
·
18ページ
·
735.6KB
·
English
·
2025.03.11 更新
概要

This 2008 MIDAS Technical Conference paper demonstrates construction stage analysis that reflects the long-term creep and shrinkage deformation of concrete vertical members. A forty-story reinforced concrete building with a wall core and a perimeter concrete frame is analysed through its construction sequence, and the vertical member displacements and girder member forces are compared with those from conventional analysis of the completed structure. The study quantifies how much of the total shortening and of the induced girder moment comes from time-dependent effects.

主要内容

01

Why Long-Term Deformation Matters in High-Rise Buildings

Vertical members undergo instantaneous elastic deformation from dead and live load plus creep and shrinkage deformation that develops over years, and most of the vertical movement in a tall building occurs during construction. Because axial stiffness and tributary load area differ between columns and walls, differential shortening is inevitable and induces additional stresses in the horizontal members and then back into the vertical members. Ignoring it also compromises serviceability items such as curtain wall function, floor levelness and piping stress, so total vertical displacements should be evaluated at design stage.

02

Limitations of Conventional Analysis

Conventional structural analysis assumes that all loads are applied instantaneously to the fully completed structure. Real buildings are erected story by story or in groups of floors, and the construction and loading sequences may differ even within one story depending on the construction plan. Actual behaviour therefore departs significantly from the conventional idealisation, particularly for girders in the lower stories where differential shortening causes large additional stresses and force redistribution.

03

Model and Load Definition

The example is a forty-story structure with core walls, perimeter reinforced concrete columns and girders, with member sizes chosen from the dead and live loads so that gravity effects on vertical displacement and horizontal member forces can be assessed. Loads comprise frame and slab self weight, finishing and masonry loads, and occupancy live load. Concrete grades step down with height and the creep and shrinkage properties are defined with the ACI model using inputs for compressive strength, ambient humidity, slump, aggregate and air content, cement content and volume-to-surface ratio.

04

Construction Sequence Modelling

The core walls lead the frame by three stories on a five-day cycle, after which girder, column and slab construction proceed together at each stage. Interior finishing begins at the first story once the twenty-first story core is reached, again on a five-day cycle, and live load is assumed to reach full intensity ninety days after construction is complete. The staged model therefore captures the change in geometry, the sequence of load application and the differing maturities of concrete at each stage.

05

Comparison of Analysis Cases

Four cases are compared: conventional analysis, analysis with vertical deformation ignored, construction stage analysis without creep and shrinkage, and full construction stage analysis with time-dependent effects. Girder end moments are examined story by story at both the column and the wall connections, along with the maximum positive moment. At lower floors the gravity moment dominates and the cases agree closely, whereas at upper floors the moment caused by differential shortening of the vertical members becomes the controlling contribution.

06

Magnitude of Creep and Shrinkage Effects

Creep and shrinkage account for roughly two thirds to three quarters of the total deformation of the columns and an even larger share for the walls, and slightly more than half of the total differential shortening. The girder moment computed with creep and shrinkage differs from the case that ignores them by on the order of forty percent, and that difference grows as the building gets taller and the girder span shortens. The effect increases further for longer construction periods.

まとめ

For concrete high-rise buildings, creep and shrinkage produce the majority of vertical member shortening and about half of the differential shortening, so they cannot be omitted from analysis. Construction stage analysis in midas Gen that models the erection sequence together with time-dependent material behaviour gives markedly different and more realistic girder moments than conventional whole-structure analysis, and ignoring these effects leads to serious design errors.

関連資料

同じカテゴリー・トピックから厳選した資料です。

STRUCTURE · MIDAS NOTE[ES_GEN] Construction Stage Analysis Reflecting Long-Term Deformation
STRUCTURE · SEMINAR[KR_2004.05] 시공단계해석을 이용한 초고층 건축물의 설계 및 시공(정재경)
STRUCTURE · MIDAS NOTE[EN_GEN] Construction stage analysis_S02 Why do Construction Stage Analysis in high-rise buildings
STRUCTURE · MIDAS NOTE[EN_GEN] Construction stage analysis_S01 Construction stage analysis at low or middle building