The final part of the midas Gen pushover series is a complete worked tutorial on a simple reinforced concrete building. It proceeds from the elastically designed model with reinforcement entered, through global control and pushover load case setup, hinge definition and assignment, and effective stiffness reduction, to running the analysis, locating the performance point and checking member performance levels and story drift.
主要内容
Model Description
The example is a five-story reinforced concrete frame and wall building of moderate height with rectangular columns, beams and thin walls, using conventional concrete and reinforcement grades and designed to ACI 318M-14. Gravity loading is self-weight plus a superimposed dead load and a live load. Seismic load and eigenvalue analysis are defined as part of the base model.
Prerequisite: Elastic Design and Reinforcement
Reinforcement satisfying the elastic code design must be entered for beams, columns and walls, and the design must actually be run so that the design strength of each member is available. The hinge capacities depend on these strengths. Without this step the pushover result has no defensible basis.
Creating Pushover Load Cases
Load cases are generally created in four directions, positive and negative along each horizontal axis. Each case switches on the P-Delta effect and the initial load, uses displacement control as the increment method, and nominates a master node whose displacement in the chosen direction is driven to a target value. The guidance given is to keep the maximum displacement below a small percentage of the building height, and a load pattern is selected with parameters such as mode number and scale factor.
Defining Hinge Properties
Each hinge is named and given an element type and material type, with flexural behavior as moment-rotation, or moment-curvature on a Eurocode basis. Axial-moment interaction is set to none for beams and to P-M or P-M-M for columns and walls, and the inelastic components are checked accordingly, with axial and major-axis bending for beams and the fuller set for columns and walls. A skeleton curve is then selected.
Reducing Effective Section Stiffness
Effective section stiffness is defined by member type following a design code table, with ASCE 41-17 given as the reference. This represents the cracked stiffness that the hinge model itself does not capture. Applying it by member type keeps the reduction consistent across the model.
Running the Analysis and Finding the Performance Point
After performing the pushover analysis, a load case is selected, a performance point method chosen, the design spectrum set, and the capacity and demand curves drawn. The step number corresponding to the performance point is read from the plot. That step number is the state at which all subsequent acceptance checks are made.
Checking Member Performance Levels
With the load case and the performance point step selected, the FEMA performance display is applied to the chosen component and each member's performance level is read in the model window. In the sample model one wall reaches collapse prevention status, indicating that strengthening of that element is required. This is the principal diagnostic result of the assessment.
Checking Story Drift
Story drift at the performance point is extracted per direction and compared against the allowable rotation for the target performance level, using the tabulated limits that run from fully operational through operational and life safety to near collapse. In the example the computed drift comfortably satisfies the relevant limit. Both member performance and drift must pass for the performance objective to be met.
The tutorial demonstrates an end-to-end pushover assessment in midas Gen: design elastically and enter reinforcement, set gravity as the initial load, build displacement-controlled pushover cases in four directions with P-Delta included, define and edit hinges with code acceptance criteria, and reduce effective stiffness per ASCE 41-17 including automatic column reduction. The performance point is then located against a design spectrum, and member performance levels and story drift at that step decide whether the performance objective is met, with a wall at collapse prevention in the example signalling the need for strengthening.