[ES_GTSNX] 32_2D_NATM Tunnel

PDF
·
37ページ
·
4.7MB
·
Español
·
2025.03.11 更新
概要

This document presents a tutorial on stress-seepage coupled analysis for NATM tunnel construction using GTS NX. It focuses on staged excavation, shotcrete lining application, and groundwater interaction affecting tunnel stability.

主要内容

01

Material Properties and Model Setup

Defines material properties for soil and tunnel lining, including Mohr-Coulomb parameters and elastic properties for structural elements.

02

Geometry and Mesh Generation

Covers tunnel section creation, soil stratification, meshing strategy, and applying boundary conditions for numerical simulation.

03

Stress-Seepage Coupled Analysis

Evaluates the interaction between seepage forces and structural stress distribution, incorporating phreatic line variation and water ingress effects.

04

Construction Staging and Excavation Sequence

Implements staged construction methodology to simulate NATM excavation, shotcrete application, and stress redistribution.

05

Post-Processing and Result Interpretation

Analyzes tunnel displacement, stress redistribution, seepage inflow, and structural forces in tunnel lining under different excavation stages.

まとめ

This study outlines a methodology for NATM tunnel analysis under groundwater conditions, integrating stress-seepage interaction and staged excavation effects.

関連資料

同じカテゴリー・トピックから厳選した資料です。

GEO · TUTORIAL[ES_GTSNX] 33_2D_Tunnel Construction Stage
GEO · TUTORIAL[KR_GTSNX] 2D 터널 침투-응력 일방향 연계해석
GEO · TUTORIAL[ES_GTSNX] 36_3D_Excavación de túnel con wizard
GEO · TUTORIAL[ES_GTSNX] 35_3D_Conexión Túnel-Lumbrera