This document presents a tutorial on stress-seepage coupled analysis for NATM tunnel construction using GTS NX. It focuses on staged excavation, shotcrete lining application, and groundwater interaction affecting tunnel stability.
핵심 내용
Material Properties and Model Setup
Defines material properties for soil and tunnel lining, including Mohr-Coulomb parameters and elastic properties for structural elements.
Geometry and Mesh Generation
Covers tunnel section creation, soil stratification, meshing strategy, and applying boundary conditions for numerical simulation.
Stress-Seepage Coupled Analysis
Evaluates the interaction between seepage forces and structural stress distribution, incorporating phreatic line variation and water ingress effects.
Construction Staging and Excavation Sequence
Implements staged construction methodology to simulate NATM excavation, shotcrete application, and stress redistribution.
Post-Processing and Result Interpretation
Analyzes tunnel displacement, stress redistribution, seepage inflow, and structural forces in tunnel lining under different excavation stages.
This study outlines a methodology for NATM tunnel analysis under groundwater conditions, integrating stress-seepage interaction and staged excavation effects.
