This presentation covers column shortening in high-rise design and then applies the whole method to the Lotte World Tower in Seoul as a case study, closing with an overview of midas Gen. It sets out why sequential loading and time-dependent material behaviour must be modelled, catalogues the structural and serviceability consequences of differential shortening, reviews the code models for creep and shrinkage prediction, and then reports the tower's predicted deformations, joint stresses and the compensation values actually applied floor by floor.

主要内容

01

Why Construction Stage Analysis Is Required

Three reasons are given: dead load is applied sequentially as the building rises rather than all at once, the material properties are time dependent through the elastic modulus, creep and shrinkage, and compensation values for differential column shortening have to be produced. The loading history runs from slab self weight, through other dead loads such as partitions and finishes, to live, wind and seismic load acting only on the completed structure. Comparing girder end moments at the wall connection with and without sequential loading shows the difference this makes.

02

Consequences of Column Shortening

The effects are grouped into structural safety and usability. On the safety side they include additional stress in the outriggers and mega columns that raises construction cost, safety of the joint members, member deformation from that additional stress, safety verification of the slabs affected by differential shortening, and verification of tower tilt including its effect on elevator operation. On the usability side they include deformation and failure of the curtain wall and exterior materials, deformation of vertical piping, reverse slope in drainage piping, slab slope affecting serviceability, breakage of finishes and deformation of internal partitions.

03

Elastic and Inelastic Behaviour

Total shortening of a concrete vertical member is the sum of elastic and inelastic deformation, and the inelastic part from shrinkage and creep is typically one to three times the elastic part. A steel column behaves linearly elastically so its shortening is fully recoverable and calculable from the axial stiffness, whereas concrete is nonlinear and inelastic even though analysis and design generally idealise it as linear elastic. The presentation also separates vertical deformation, comprising shortening, settlement and construction error, from horizontal deformation caused by differential shortening, settlement, uneven load from the construction method, plan asymmetry and construction error.

04

Prediction Models and Strain Decomposition

Accurate prediction is said to require two things: reliable creep and shrinkage data for the particular concrete mix, and analytical procedures that carry those time effects into the design. The available predictive models listed include the Eurocode model, the American concrete institute committee model, the Bazant B3 model, two generations of the European committee model, the Portland Cement Association method and GL2000. The total strain at any time is expressed as the sum of instantaneous, creep and shrinkage components, with the instantaneous strain formed from the stress divided by a modulus that itself grows with concrete age through a maturity coefficient dependent on the cement type.

05

Lotte World Tower Overview

The case study building is a 123-story mixed-use tower in Jamsil, Seoul, rising about five hundred fifty-five metres to the antenna spire with a floor area of roughly three hundred thousand square metres, housing office, residential, hotel and observation deck functions. It is a combined reinforced concrete and steel structure whose lateral system is a core wall with outrigger and belt trusses, founded on a mat foundation, and was constructed between 2011 and 2015. The scale is what makes the shortening effects large enough to require the full three-analysis treatment.

06

Predicted Deformations of the Tower

The pre-analysis reported vertical shortening at the top of the tower of a few hundred millimetres, differing between the steel frame and the core wall and again between the mega columns and the core, with the differential shortening between core and columns amounting to several tens of millimetres. Horizontal deformation at the top was predicted separately for the two plan directions, and settlement of the core wall and of the columns was predicted to differ by around twenty millimetres. Safety checks were carried out specifically for the elevator rails and the vertical piping.

07

Joint Stresses and the Need for Delay Joints

Without a delay joint the additional force in the first and second outrigger levels reached several thousand tons, and installing a delay joint cut those values to roughly half, which is why the delay joints were required. The differential deformation between slab and column produced additional slab stress, and the tower-to-podium connection developed an additional moment large enough that a settlement joint and a dedicated safety check were required. These figures illustrate how much of the outrigger demand comes from shortening rather than from applied load.

08

Compensation Applied on Site

Compensation distinguished an absolute correction for the core wall, to secure the design level, from a relative correction for the columns, to take out the differential against the core. The process ran from pre-analysis, through analysis informed by material tests, to repeated re-analysis informed by measurement, producing a first correction, a second correction and additional corrections for the floors still unbuilt. The resulting table specifies, floor group by floor group over the full height, the core correction relative to design level and the column correction relative to the core level, with the largest column corrections in the lower and middle zones spanning the outrigger levels.

まとめ

Column shortening in a supertall building is dominated by the inelastic creep and shrinkage component and produces both large additional forces in stiff elements such as outriggers and widespread serviceability problems in facades, piping and elevators. The Lotte World Tower case shows the full method in practice: staged analysis with code creep and shrinkage models refined by material testing and site measurement, delay joints that roughly halve the outrigger demand, and a floor-by-floor compensation table separating absolute core correction from relative column correction.

関連資料

同じカテゴリー・トピックから厳選した資料です。

STRUCTURE · MIDAS NOTE[KR_GEN] 기둥축소량의 해석 및 최적보정 그리고 실무적용
STRUCTURE · MIDAS NOTE[EN_GEN] Construction stage analysis_S04 What should an engineer do for column shortening
STRUCTURE · SEMINAR[KR_2004.05] 시공단계해석을 이용한 초고층 건축물의 설계 및 시공(정재경)
STRUCTURE · MIDAS NOTE[EN_GEN] High-rise building design_S03 Column shortening in High-rise design